In a little under a week, we have:
Replaced outlets and light switches throughout the house
Painted the living room and dining room (light blue) and primed the ceiling in those rooms
Planted 2 hydrangeas, 2 hastas and 2 hollys
Cleaned refridgerator, cabinets and stove in kitchen (Thank you, Cindy!)
Removed the plastic tile from the walls and shower in the bathroom... yes, I said plastic tile... there is such a thing.
Tore out the walls in the bathroom and some of the lath- in preparation for drywall (Thank you, Bill!)
Ran wiring to the bathroom for an outlet. An outlet in the bathroom? What a novel idea!
Removed the shower fixtures and prepared the water pipes for shutoff valves
Unstuck the stuck and painted shut windows
Repaired the door lock on the front door
Began repairing the wall above the fireplace
Began sanding the floors in the dining room
Had 3 cracks repaired in the basement... still have one left to fix
Had the chimney flue installed, the gas line in the basement replaced and a gas shutoff valve installed on the oven
Owning a home is hard work!
Pictures coming soon.
I had to get a new Blog - storage is up, people!!
13 years ago
Our pleasure - it's exciting to see such progress being made!It's going to be beautiful!!
ReplyDeleteWow!! So excited for you guys... it already is taking shape into being a wonderful home for you both!
ReplyDeletewow! I'm feeling a wee bit lazy right now.
ReplyDelete